PRE-INSTALL
CLEARANCES
CEILING CLEARANCE
A minimum clearance of 350mm from any combustible
material is required from the top of the oven. These
clearances apply over and above the oven core and
insulation materials, from the outer most extremity of the
oven’s final finished surface.
WALL CLEARANCE
A minimum of 50mm clearance is required from all
sides of the outermost extremity of the oven walls.
If a façade or material is in contact with the oven, it
must be comprised of completely non-combustible
materials. When non-combustible materials are attached
to the oven, the above clearances must be measured
from the outside of those non-combustible materials.
Any materials 750mm to each side of the oven doorway
and above must be constructed of non-combustible
materials.
1000mm
50mm
Side profile of Classic oven.
Red area: minimum clearance
The oven stand should only be installed on a noncombustible floor surface. The non-combustible floor
surface should extend a minimum of 1000mm out in front
of the oven and extend by a minimum of 750mm from either
side of the oven entrance.
When using a gas burning oven the space below the stand
must NEVER be used for storage. This space is required
for air intake of the gas burner. Not maintaining air
access to the burner is a serious risk and could void the
oven warranty.
350mm
750mm
Front profile of traditional oven.
Red area: minimum clearance