Let's Connect Ed3 2023 sml - Flipbook - Page 5
WORK ACROSS CAMDEN
WORK AT MOUNT ANNAN
LEISURE CENTRE COMPLETE
Improvements and remediation work to Mount Annan Leisure
Centre (MALC) are now complete and the facility has re-opened to
the public in full.
The $1.75 million project was needed to address deteriorated roo昀椀ng
elements and repair work to corroded steel within the building.
Work included restoration work to the roof above the 25-metre and
leisure pools as well as:
• Restoration of rusting structural steel members/purlins;
• Corroded structural column repairs;
• Replacement of water damaged plasterboard/bulkheads;
• Visual painting improvements;
• Replacement of leaking/aged box gutters; and
• External roof 昀氀ashing replacements/repairs.
AN ALPHA PLAYGROUND
The playground at Alpha Park in Camden has recently been
upgraded.
CAMDEN CIVIC
CENTRE IS GETTING
A MAKEOVER
Camden Civic Centre hosts a multitude of local,
state and national events each year and is one of
our most used facilities.
The venue is incredibly versatile and has served
the community well for many years – but needs
a facelift and improvements for improved
community use.
The proposed upgrade works will create a new
entry and foyer space; provide better connection
from John Street to the Civic Centre; increase the
amount of a昀昀ordable multipurpose art making and
community spaces available; create outdoor areas
suitable for multi-purpose use; attract visitors to
Camden; and so much more.
The $180,000 project has seen:
•
•
•
•
A new swing set, including an inclusive two-seater nest;
A new slide;
An upgrade of the seating area; and
Landscaping.
WANT MORE
INFO?
Scan the QR code to 昀椀nd more
information on these projects
and others.