Cutcsa compromiso con el cuidado del medioambiente - Flipbook - Página 23
The Charging Center project at the Añón Plant is planned to be able to charge 100 buses simultaneously. In its first
stage, 23 BYD chargers are operational, each one with a charging power of 80 kW (40 kW x 2).
Slow night charge is carried out on alternating current with IEC62196 type charging connectors. A software which
was jointly developed with Enel X allows the monitoring and optimization of the charging process.