(1) PROJECT NAME: WATER / WATER METER REBUILD & REPLACE PROGRAM
PROJECT STATUS: Existing in Edmunds
ACCT1#:
042-8600-533-65-07
ACCT2#:
ACCT3#:
(2) PROJECT DESCRIPTION AND JUSTIFICATION:
PROJECT ADDITIONS/CHANGES JUSTIFICATION:
Rebuild/replace water and reclaim water services each year as part of an ongoing meter
program. Improve efficiency in accuracy and accountability in water audits and billing
consumption. Replace parts that are worn, defective, or in need of upgrading. This will
include, but not be limited to, tubing, fittings, valves, meter boxes, and backflow devices.
(3) PURPOSE OF PROJECT:
Extend life of existing infrastructure
X
Replace existing infrastructure
Expand infrastructure
Price is changed due to price increases. Changed verbiage to better fit
the project. Other parts get replaced or rebuilt, not just meters.
Replace existing vehicles or equipment
Add new equipment or vehicles
Capital improvements
Strategic plan /comprehensive plan bonus
(4) ESTIMATED COST BY YEAR:
Current Year
21/22
FY 22/23
FY 23/24
FY 24/25
FY 25/26
FY 26/27
TOTAL
a. Land Acquisition
b. Planning
c. Design
d. Architecture/Engineering
e. Site Development/Construction
150,000 180,000 180,000 180,000 190,000 190,000 920,000
f. Equipment,Vehicles, Etc
g. Contingency
h. Other
i. Project Additions/Changes
TOTAL
150,000 180,000 180,000 180,000 190,000 190,000 920,000
(5) PRIORITY:
Timetable
safety concern, hazardous condition, agency compliance, non-funca.
risk
tional, etc
First Year
highly visible, benefit outweighs cost over short period, economic
b.
return on investment
development potential
1 - 3 Years out
c. X service level mainten.
maintains City desired level of service
2 - 5 Years out
d. service level improvm.
new or improved service to meet demand
As Budget Allows
(6) EFFECTS ON ANNUAL OPERATING BUDGET:
Current Year
YEARS
21/22
FY 22/23
FY 23/24
FY 24/25
FY 25/26
FY26/27
2028-2032
TOTAL
Change in Fuel Costs
- - - - - - - Change in Utility Costs
- - - - - - - Change in Maintenance
- - - - - Costs
(7) PROPOSED FUNDING SOURCE(S):
(9) PROJECT OR EQUIP LOCATION:
Various
1) Water & Sewer R&R Fund 042
2)
3)
(7a) POTENTIAL GRANT FUNDING SOURCE IF APPLICABLE: (List source and matching requirements)
N/A
(8) PROJECT LEAD NAME & CONTACT INFO (ADDITIONAL PROJECT INFO AS NEEDED)
Rick Gierok - Director of Public Works