ROOT CREEK WATER DISTRICT AGRICULTURAL WELL 276 &
WASTEWATER TREATMENT PLANT EXPANSION
MADERA, CA
The purpose of this two-part project is the expansion of the existing
Root Creek WWTP as well as the conversion of the existing
agricultural Well 276 into a municipal well. The scope of work for
the expansion includes a 100 ft x 100 ft concrete equipment pad
with trench drains and pipe risers, installation of owner supplied
pump station, installation of 200 ft x 100 ft lined storm basin, site
grading and paving, site fencing, and the installation of 5,500 LF
of underground pipe. The well project includes demolition, clearing
and grubbing, site grading, site piping, wellhead construction, well
equipping, and relocating facilities and electrical equipment from
Well 4. This project was challenged by supply chain disruptions and
material delays, but our crews persevered with creative sequencing
to keep the project on schedule.
Root Creek Well
Root Creek Water District
WML Project Team
Owner/Engineer Team
Project Manager: Ben Allen
Owner: Root Creek Water District
Intern: Alex Cortez Cardenas
Design Engineer: Provost & Pritchard
Carpenter Foremen: Todd Woods and Bobby Dixon
Operator Foreman: Nick Eastham
LEONARD SYSTEM EXTENSION PROJECT
BUTTONWILLOW, CA
This project consists of approximately 35,000 LF of 27” PVC PIP
pipeline that will deliver water to areas of the district primarily served
by groundwater wells. WML is approximately 25% complete with
the installation of the mainline while the first 4,500 LF of pipeline
were installed in areas affected by groundwater infiltration from an
unlined canal. Material procurement is still very challenging due to
global supply constraints. The project is anticipated to be completed
in 2023.
WML Project Team
Project Executive: Jeff Mathiowetz
Project Manager: Allen Hickernell
Foreman: Tim Miller
Leadman: Harlan Albitre
Laborers: Kelly Freeman and Alexis Echeverria
Operators: Jeff Ellington, Joshua Gafford, Robert Baker and
Kyle Joyner
Laborer Apprentice: Anthony Rodriguez
Installation of the main line is 25% complete.
Semitropic Water Storage District
Owner/Engineer Team
Owner: Semitropic Water Storage District (Isela Medina and Mike Luna)
Design Engineer: GEI (Tod Woodson and Luis Flores)