Minority-Commerce-Weekly-Newsletter - Flipbook - Page 21
April 11-17, 2024
Minority Commerce Weekly - “MWDBE/SDVOB Contract Reporter”
WDF invites all interested and Certified MBE/WBE/DBE & SDVOB firms to submit proposals for the following Projects:
GENERAL CONSTRUCTION BIDS:
Details and Contract documents can be obtained by Dina Cardoso (P) 914-776-8185 (E)
dcardoso@wdfinc.net . Bid dates are subject to change.
DDC Design Build NYC Borough-Based Jails Program (Manhattan)
Date: 8/2024 Time: 1 P.M. Goals: Combined MBE/WBE 30%
This project is subject to a Non-Disclosure Confidentiality Agreement. Please contact estimating@wdfinc.net
for further information or to request Bid Documents
Awarded Projects
NYPA ES-GSN-0839; NYCDEP WI285A- Goals: MBE 15%; WBE 10%.
PANYNJ Newark Airport Terminal 1- Goals: M/WBE 20%
Trades included but not limited to: 1. Material Supplies – Pipe, Valves, Fittings, Fin-tube, Air outlets; 2. Equipment – Air Curtains, A/C Units Split, A/C Units, AHU’s /
RTUs, Dampers, Fans, Fuel Oil Pump/Specialties, Fuel Oil-Initial Fill, Heat Exchanger, Heat Tracing, Heaters, Pumps , Starters/VFD’s, Thermometers & Gauges, Sound
traps; 3. Subcontracting – HVAC piping, Rigging, Sheet metal (and/or supplier), Electrician to Install Automatic Temperature Controls, Insulation, Water treatment , Air
and water Balancing, Duct Cleaning
DCAS Citywide Plumbing and Fire Suppression #85621B0011 – Goals: M/WBE 25%
Trades included but not limited sitework, concrete, masonry work, metals, woods & plastic, thermal & moisture protection, doors & windows, finishes, specialties,
equipment, special construction, conveying system, HVAC, plumbing, electrical and instrumentation.
NYCHH 23-JOC-HV1 #26-2310000 – Goals: M/WBE 30%
Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, finishes, specialties,
equipment, furnishings, special construction, conveying equipment, integrated automation, electrical, communications, electronic safety and security, earthwork,
exterior improvements, utilities.
NYC Dept of Corrections JOC Plumbing Work #07223B0001 – Goals: M/WBE 25%
Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, finishes, specialties,
equipment, furnishings, special construction, conveying equipment, integrated automation, electrical, communications, electronic safety and security, earthwork,
exterior improvements, utilities.
DDC Design Build NYC Borough-Based Jails Program (Brooklyn) – Goals: M/WBE 30%
This project is subject to a Non-Disclosure Confidentiality Agreement. Please contact estimating@wdfinc.net for further information or to request Bid Documents
Trades included but not limited to site conditions, concrete, masonry, metals, wood & plastic, thermal & moisture protection, openings, finishes, specialties, riggings,
testing & balancing, water treatment, insulation, exterior improvements, plumbing, HVAC, electrical, communications. electronic safety and security, earthwork and
utilities
Awarded NYCDEP Job Order Contracts
Goals: Combined MBE/WBE 30%
Trades included but not limited to: Plumbing- Site work, Asphalt paving, Water main, Sewer work, Electrical and Insulation:
Resiliency Program JOC General Construction RLCY-S-J06G and RLCY-S-J12G, Location – Various: Trades included but not limited to plumbing- site work, asphalt
paving, water main, sewer work, electrical and insulation.
JOC-18-SP: Plumbing Work at South Region (Newtown Creek, North River, Oakwood Beach, Port Richmond, Red Hook facilities)
JOC 16NP, Location- Various: Mechanical/Plumbing Projects throughout the North Region of DEP Facilities
JOC-17-EG: General Construction Work at various Bureau of Wastewater Treatment facilities within East Region (26th ward, Coney Island, Jamaica, Owls Head and
Rockaway)
JOC-17-EP: Plumbing Work at various BWT facilities within East Region, Queens and Brooklyn, NY (26th Ward, Coney Island, Jamaica, Owls Head and Rockaway)
JOC-17-NG: General Construction for North Region, Queens, Bronx and Manhattan, NY
JOC-20-EP: Plumbing Work at various BWT facilities within East Region, Queens and Brooklyn, NY (26th Ward, Coney Island, Jamaica, Owls Head and Rockaway)
JOC-22-SP: Plumbing Work at various BWT facilities within South Region (Newtown Creek, North River, Oakwood Beach, Port Richmond, Red Hook facilities)
Awarded DASNY Contracts
Goals: MBE 18%; WBE 12%
DASNY JOC REGION CR403 BRONX/K/NASSAU/M/SI Trades included but not limited to: Insulation, Controls, Electric, Chemical treatment, Confined Space.
DASNY JOC REGION CR539 BRONX/K/NASSAU/M/SI Trades included but not limited to: Insulation, Controls, Electric, Chemical treatment, Confined Space.
Section 3 Employment Opportunities
WDF supports hiring Section 3 of the Housing and Urban Development (HUD) mandate that requires employment and other economic opportunities generated by
federal assistance to public housing authorities to be directed, whenever possible, to public housing residents and other low and very low-income residents to work on
all of our New York City Housing Authority (“NYCHA”) projects. WDF supports hiring Resident Employment Program (REP), which requires that 15 percent of the labor
amount of NYCHA construction contracts greater than $500,000 be spent on resident hiring. To that end, WDF’s approach to meet NYCHA Section 3 requirement and
our past Section 3 performance has been to commit to working with Resident Economic Empowerment Sustainability Department (REESE) to source Category 1 and 2 residents.
Awarded NYCHA Contracts
Goals: REP 15%; Section 3 30%; MWBE 30%; M/WBE Business Concerns
Trades included but not limited to: Site work, Concrete, Masonry, Misc. Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes,
Specialties, Furnishings, Electrical, Landscaping and Pest Control, Carpentry, Painting, Acoustical Ceiling, Sprinkler, Fire Protection, Structural Steel, Insulation,
Electrical, Pumps, Storefront Glass, Roofing.
21