Ulladulla AF00192322 5/17928.1B - Flipbook - Page 24
2.
XV1. Renew 14 panes of glass in school and laundry windows.
XVII. Supply and spread 15 loads of gravel on wash away
at west end of school.
XVIII.. Renew tank stand at school.
Supply and fasten 4 dozen new hut pegs.
Repair lobby (about 90ft.new lining and paint with 3
coats of good paint).
XX1.Minor repairs to school verandah floor.
XX11. Repair floor of weathershed and fasten loose iron.
The whole of the work to be carried out to the
satisfaction of the Inspector of Schools or other person
appoitted.
/4L
Z4r‘_ar