EMIS ReportDesign-Prelim 2020sep11 - Flipbook - Page 39
Kramer, H., G. Lin, C. Curtin, E. Crowe, and J. Granderson. 2019. “Building Analytics and Monitoring-Based
Commissioning: Industry Practice, Costs, and Savings.” Energy Efficiency. 13: 537-549(2020). https://doi.
org/10.1007/s12053-019-09790-2.
REFERENCES
Henderson, P., and M. Waltner. October 2013. Real-Time Energy Management: A Case Study of Three Large
Commercial Buildings in Washington, D.C. Natural Resources Defense Council, CS:13-07-A. https://www.nrdc.
org/resources/real-time-energy-management-case-study-three-large-commercial-buildings-washington-dc.
Accessed September 22, 2020.
Lin, G., R. Singla, and J. Granderson. 2017. Using EMIS to Identify Top Opportunities for Commercial Building
Efficiency. Berkeley, California: Lawrence Berkeley National Laboratory. LBNL-1007250.
Meiman, A., K. Brown, M. Anderson. 2012. Monitoring-Based Commissioning: Tracking the Evolution and
Adoption of a Paradigm-Shifting Approach to Retro-Commissioning. Proceedings of the 2012 ACEEE Summer
Study. https://cxwiki.dk/files/stream/public/ACEEE_Tracking_the_Approach_to_Retro-Commissioning_2012.pdf.
Accessed September 22, 2020.
Mills, E., and P. Mathew. 2009. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU
Projects. Berkeley: Lawrence Berkeley National Laboratory. LBNL-1972E.
Roth, K., D. Westphalen, M. Feng, and P. Llana. 2005. Energy Impact of Commercial Building Controls and
Performance Diagnostics: Market Characterization, Energy Impact of Building Faults and Energy Savings Potential.
Report for the U.S. Department of Energy.
San Diego Gas & Electric (SDG&E). 2015. M&V Report – Model-based Predictive HVAC Control Enhancement
Software. Report for the San Diego Gas & Electric Emerging Technologies Program. DR13SDGE0006.
https://www.etcc-ca.com/reports/model-based-predictive-hvac-control-enhancement-software. Accessed
September 22, 2020.
Berkeley Lab | Proving the Business Case for Building Analytics
37