Plant description
Gauteng transmission
network . . . . . . . .
ROMPCO Pipeline . .
Sasol signed an agreement to divest of all our
interests in Canada. The transactions closed on 29 July
2021.
The table below provides the production
capacity at 30 June 2021.
Plant Description
Central Processing Facility. . . .
Processing Facilities . . . . . . . .
Location
Pande-Temane PPA, Mozambique
Farrell Creek, Canada
Secunda, Witbank and
Middelburg pipeline
Transnet Pipeline
transmission pipeline
Design Capacity
491 MMscf/day gas
320 MMscf/day gas
The table below provides the number of
productive gas wells at 30 June 2021. A productive
well is a producing well or a well that is mechanically
capable of production.
Number of productive
wells 30 June 2021
Productive gas wells
Gross . . . . . . . . . . . . . . . . . . . . . . .
Net . . . . . . . . . . . . . . . . . . . . . . . . .
Mozambique Canada
18,0
12,6
158,0
79,0
(1)
176,0
91,6
The table below summarises the average sales
prices for natural gas and petroleum liquids produced
and the average production cost, not including ad
valorem and severance taxes, per unit of production for
each of the last three years.
2019
Average sales prices
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
Average production cost(1)
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
2020
Average sales prices
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
Average production cost(1)
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
2021
Average sales prices
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
Average production cost(1)
Natural gas, per thousand standard cubic feet .
Natural liquids, per barrel . . . . . . . . . . . . .
Mozambique Gabon(2) Canada
(Rand per unit)
...
...
32,6
514,6
—
977,7
13,0
517,4
...
...
6,3
—
—
458,6
11,1
—
...
...
33,9
370,5
—
756,2
17,3
427,7
...
...
6,1
—
—
426,9
20,9
—
...
...
24,2
369,2
—
737,7
27,0
434,7
...
...
6,2
—
—
425,4
26,5
—
(1)
Average production costs per unit of production are calculated according to
the primary sales product.
(2)
Information included up to 25 February 2021, which was the effective date of
divestment of our interests in the EMP in Gabon.
Design capacity(1)
Gauteng
From Central Processing
Facility (Mozambique) to
Pressure Protection Station
(Secunda) (865km)—From
Mozambique to Secunda and
Sasolburg
128 bscf/a
South Africa
11 bscf/a
South Africa
23 bscf/a
191 bscf/a
Nameplate capacity represents the total saleable production
capacity. Due to the integrated nature of these facilities, the
requirement for regular statutory maintenance shutdowns and
market conditions, actual saleable volumes will be less than the
nameplate.
A sale and purchase agreement was concluded
in terms of which Sasol agreed to dispose of a 30%
interest in ROMPCO. We will retain a 20%
shareholding in ROMPCO and will continue to operate
and maintain the pipeline in terms of the commercial
agreement. Two of the existing shareholders, the South
African Gas Development Company Limited (iGas)
and Companhia Moçambicana de Gasoduto S.A.R.L.
(CMG), have recently exercised their pre-emptive right
to acquire 30% of our equity in ROMPCO. The sale
will therefore be concluded with iGas and CMG. This
process is underway, and will be subject to a number of
conditions precedent, including the standard regulatory
approvals.
Total
Sales prices and production costs
Average sale prices and production costs
for the year ended 30 June
Location
The following table provides details of the
production capacity and location of the main jointly
held plants where our Gas segment has an interest.
Plant description
CTRG. . . . . . . . . . . . . . . . . . . . .
(1)
Location
Ressano Garcia, Mozambique
Design capacity(1)
175MW
Nameplate capacity represents the total saleable production capacity. Due to
the integrated nature of these facilities, the requirement for regular statutory
maintenance shutdowns and market conditions, actual saleable volumes will
be less than the nameplate.
CTRG is a power generation facility, located
at Ressano Garcia. A Sale Securities Purchase
Agreement was signed with Azura Power Limited on
20 December 2020 for the divestment of our full
shareholding in CTRG. The transaction is subject to a
number of conditions precedent, which include
regulatory approval.
Transportation capacity
Fuels—Plants and facilities
The table below provides details of the
transportation capacity and location available to our
Gas segment.
Our facilities in South Africa
Our main manufacturing facilities are located
at Secunda operations. Additionally, the Natref
refinery, based in Sasolburg, is approximately 2,0 km2.
63