221005 MArys D&AStatement - Flipbook - Page 58
Option 5: Undercroft development
This option retains the St Mary’s Centre, and makes a connection
from it into the existing undercroft.
The St Marys Centre would provide a front door for Mary’s, and the
multi-use space could be in the undercroft.
However, the undercroft is not very large (only under the chancel)
and there is not enough space in the undercroft to provide the
accommodation required. In addition, there is no daylight, and no
means of providing it (no space to make a lightwell or doubleheight space).
10 Sta
T 020
mail@
www.
For these reasons, this proposal was discounted.
St M
Sectio
1:50
05.10
STATU
430
Notes
Storage
Paved courtyard up to
pavement line
Bench
Store
Vault
Main hall
Vault
Door made full height
Brewery
Riser 1
Kitchen
900
Door closed to make
space for stairs
Consultation
room
Drylining, insulation and cavity
drain membrane to existing
external walls
Disabled WC &
shower
Store / Plant
Cut through
relieving arch here
Open platform lift
Column removed
Cut through relieving arch here
2150
Storage
900
Multipurpose room / gym
Cut through relieving arch here
Entrance hall
Bench
Riser 1
External envelope of SMC retained, with
repairs, and a new entrnace door
Store
Planted courtyard
Column removed
Recording Studio
Storage
Office
Kitchen
Store
Sacristy
storage
RETA
Sacristy
Church beyond
10 Station Parade, B
T 020 8675 2544
mail@dowjonesarch
www .dowjonesarchi
St Mary's Prim
Basement and low
1:50
05.10.2020
STATUS:
FOR C
430-00-10
Mary’s, Primrose Hill
Dow Jones Architects