Appendix B: MEP Engineer’s drawings
Excavation
Lighting track with spot
lights and perimeter
wall lights to update
existing provision
Track fittings dimmed
from wall
Demolition
New wall
Adjusted root zone
Paved courtyard up to
pavement line
Bench
Store
Storage
UFH man.
Vault
External lighting
New security and
access control system
in store. Access
controlled external
door
and inner doors.
Canopy
As Paxton or similar.
Intruder detection to
perimeter spaces with
door contacts and PIR
As Honeywell Galaxy
with G3 devices.
T6 B
Main hall
Vault
Brewery
1500mm up/down
suspended light with daylight
dimming control
1200mm surface light fitting
with on/off control
Surface fitting with daylight
dimming control
Downlight type fitting with
daylight dimming control
MVHR
ABOVE
Timber wall spanning above
Surface wall light with
daylight dimming control
Steel post. NB this
area is quite tight
Disabled WC &
shower
IP44 surface fitting with
occupancy control
Entrance hall
Vertical suspended feature
lighting in void
Lift
Assume 50% of fittings are emergency
Lift
pump
Existing incoming
electricity supply head
and meter retained on
flank wall. New
cupboard provided to
conceal.
New 200A TPN Fused
Switched Disconnecter
(Glasgow Switch)
replaces existing DB
and feeds new MCCB
board in adjacent
storeroom via submain
through flank wall
d
tricte
Res space
d
hea .8m