Notes
Excavation
Demolition
New wall
Bench
Store
Vault
1500mm up/down
suspended light with daylight
dimming control
Storage
Vault
1200mm surface light fitting
with on/off control
Surface fitting with daylight
dimming control
Brewery
Downlight type fitting with
daylight dimming control
Surface wall light with
daylight dimming control
Small
consulting
room
Skylight
above
IP44 surface fitting with
occupancy control
Void above
entrance hall
Vertical suspended feature
lighting in void
Fixed bench
Lift
Assume 50% of fittings are emergency
Electrical socket and data provision to be
confirmed, the following is assumed:
Multi-purpose Room 8no. double sockets +
4no. data points + high level power and data
for projector. With additional power for
white goods and induction hob/oven.
Line of existing building to be
demolished
Assumed electric
induction hob - no gas
in kitchen.
Landing 2no. double sockets + high level data
for WiFi
Small Consulting Room: 4no. double sockets
+ 2no. data points
Multi-purpose room
Main Hall: Matching existing provision
Skylight above joists
on
jecti
Pro reen
sc
man
.
Loft space
for plant
UFH
Cyl.
HR
MV
TWO STOREY OPTION
Store
Sacristy
Church beyond
SMC Youthwork, London
Stage 3 Electrical Arrangements
J201105 SK_AH_E/02 P2
10 Station Parade, Balham High Road, London , SW12 9AZ
T 020 8675 2544
mail@dowjonesarchitects .com
www .dowjonesarchitects .com
St Mary's Primrose Hill
First floor plan
1:50
05.10.2020
STATUS:
Mary’s, Primrose Hill
1:50@A3
For Comment
FOR COMMENT
430-00-110
C
Dow Jones Architects