221005 MArys D&AStatement - Flipbook - Page 62
Notes
Excavation
LTHW underfloor
heating with local zone
control
Manifold in store
Demolition
New wall
Local electric hot water
generation for sink.
Adjusted root zone
Manifold for UFH
Paved courtyard up to
pavement line
Bench
Store
Storage
UFH man.
Vault
T6 B
Main hall
Vault
160Ø ductwork
connections
Fresh air and exhaust
to above
Supply and extract to
consulting room from
below
Brewery
Canopy
LTHW underfloor
heating with local zone
control
Timber wall spanning above
MVHR
ABOVE
Vent Axia Sentinel
Kinetic Horizontal
200ZH MVHR unit in
ceiling void of toilet
895 x 570 x 200
Serving WC and
Counselling Room
above
Steel post. NB this
area is quite tight
Disabled WC &
shower
Entrance hall
Lift
LTHW underfloor
heating with local zone
control
Manifold in Sacrisity
Lift
pump
d
tricte
Res space
d
hea .8m
1