Stevenage Town Investment Projects - Stevenage 75th anniversary magazine | biz4Biz - Magazine - Page 24
Stevenage Town Investment Projects
Stevenage Town Investment Plan projects
1
2
Station Gateway
Much of the town’s original
New Town infrastructure has
aged, leaving facilities that
are no longer fit for purpose
for the town’s businesses and
residents. The Gateway provides
an opportunity to address
this and to transform an area
characterised by roads, surface
level car parking and poor-quality
buildings into a new thriving
commercial and residential
quarter for the town.
10
Stevenage Technology &
Innovation Centre
New 4,000sqm State of the
art Innovation & Technology
Centre to be operated by
North Hertfordshire College in
partnership with key businesses
to provide new training
opportunities.
Digital Infrastructure –
hyperfast broadband
Feasibility study to assess
what is needed in terms of
infrastructure investment for the
Town Centre and Gunnels Wood
Road employment area to help
accelerate new digital technology
provision.
1
1
3
9
The scaling of this drawing cannot be assured
Date
Drn Ckd
-
Revision
-
Gunnels Wood
Road Infrastructure
improvements
HCC, SBC & Herts LEP are
proposing investment into the
existing transport infrastructure
on Gunnels Wood Road
employment area to address
identified capacity constraints
that could limit new employment
development.
4.1
3.4
Stevenage Town Investment Plan projects
LEGEND
8
Project
Site Boundary
Stevenage Town Centre
Investment Plan
Cycling & Pedestrian Connectivity incl. Heritage Arts Trail
Investment Theme 3: Connectivity
3.4 Gunnels Wood Road infrastructure improvements - Part 1 (£2m) & Part 2 (£8m)
Drawing Title
Location Plan
Gunnels Wood Infrastructure
Scale
Date
1:12,500 @A3
05.10.2020
Stevenage already has very good cycling and pedestrian infrastructure,
but parts have become fragmented and disconnected with
redevelopment and with a lack of investment, parts are now considered
unsafe.
Project No
31540
0
Drawn by
ML
Drawing No
100
300
200
Check by
AF
Revision
CE-P-04
500m
-
400
Town Planning ● Master Planning & Urban Design ● Architecture ●
Landscape Planning & Design ● Infrastructure & Environmental Planning ●
Heritage ● Graphic Communication ●
Communications & Engagement ● Development Economics
Reproduced from the Ordnance Survey Map with the
permission of the Controller of HMSO. Crown
Copyright Reserved. Licence No. 100019279.
bartonwillmore.co.uk
\bartonwillmorecfsCambridgeFiles31000 - 3199931500-3159931540 STEVENAGE TOWN CENTRE INVESTMENT PLANA4 - Drawings & RegistersPlanning31540 CE-P-04 Location Plan.dwg - A3
A five-phase strategy is proposed. Progress is already underway
with the first phase as part of the delivery of the Town Centre SG1
redevelopment. This project aims to extend and build upon this
momentum to deliver the next two phases, phases 2 and 3.
Certificate FS 29637
Offices at Birmingham Bristol Cambridge Cardiff Ebbsfleet Edinburgh
Glasgow Leeds London Manchester Newcastle Reading Southampton
7