Copy of print copy of brochure without bleed - Flipbook - Page 16
1.
Hutchinson's PVC Solutions impressed us with their
expertise and professionalism during the installation of
Tension-Wall. Providing exceptional temperature control
and partitioning solution.
NIKON PROJECT
Nikon is a worldwide company who manufacture
imaging products, optics, precision equipment, and
instruments. They were looking for a cost effective way
to divide areas to help keep a specific area within
certain temperatures due to the machine that they
use. Nikon approached various companies to find
their solution and ultimately chose Hutchinson's PVC
Solutions because of our competitive pricing, the
superior quality of our product and our extensive
experience in installing fabric partitioning solutions.
Take a look at the
full installation
video
Tension-Wall was the perfect solution to divide the relevant storage areas for temperature
control. The overlap joining system provides an over 99% tight seal. And because the
product can be designed to fit any size and shape of building and will be easily installed
around existing ducts and pipework, no gaps are left around the edges. For this particular
project the client chose a heavy duty FR 610 grey fabric starting from the floor and
extending up to 8.5 metres high.
Not only would this add extra protection against accidental damage, but it provides a
clean and smart aesthetic. The client chose translucent strip curtains to provide maximum
light transit between zones, to help keep temperatures stable and for ease of access. The
great thing about Tension-Wall is that it’s quicker and cleaner to install and can even be
reconfigured, removed or relocated should business needs evolve.
There’s also no need for additional intermediate support framework and it is installed
using the existing structure and curvature of the building. From when the order was placed
to the finished project was 6 weeks.
-12-