OD09609 Gazeley EU Print Product Guide V10 SG - Page 43



THE GAZELEY STANDARD
THE
HANDOVER
The building handover from Gazeley to
customer is closely managed to ensure a
clear and efficient handover to the building
users. At the handover stage, the following
information (as a minimum) is provided:





As-built drawings and information
Commissioning certificates
BIM model
Building logbook
Overview of building
maintenance requirements
THE PAPERWORK
All documents for Gazeley Standard buildings are
provided in both electronic and hard copies. A filing
cabinet is provided on the plant deck to house the
customer’s hard copies of the documents and the soft
copies are provided via USB stick and a downloadable
file sharing service. For ease of access, all soft copy
documents are provided in industry-standard format.
BIM MODEL
All Gazeley buildings are designed and constructed
in what is known as a 3D environment called BIM
(Building Information Modelling). The benefit for
customers is that this allows fit out requirements
to be incorporated, making the task much more
efficient in terms of design and cost.
In addition, the BIM model can be utilised by
facilities management teams to save time and costs,
enabling quicker access to asset information and
helping to reduce preventative maintenance.
42
GAZELEY - PRODUCT GUIDE
GAZELEY - PRODUCT GUIDE
43

Paperturn



Powered by


Full screen Click to read
Paperturn flip book viewer
Search
Overview
Download as PDF
Print
Shopping cart
Full screen
Exit full screen