OD09609 Gazeley EU Print Product Guide V10 SG - Page 56



TEMPERATURE CONTROL
The Gazeley Build to Suit service can incorporate
temperature-controlled zones within the building:
Chilled chambers can generally be accommodated by
building directly from the warehouse floor with minimal
additional structural steel added at high level.
VEHICLE WASH, FUELLING STATION
AND WEIGHBRIDGES
Vehicle wash and fuelling facilities can be incorporated
into the scheme to suit customer- specific requirements.
Their installation can be included as part of the
construction programme, avoiding the requirement for
costly retro-fit of equipment.
Freezer rooms can be incorporated by adding sub-floor
insulation and frost-prevention.
Plant rooms and areas are provided as required.
56
GAZELEY - PRODUCT GUIDE
GAZELEY - PRODUCT GUIDE
57

Paperturn



Powered by


Full screen Click to read
Paperturn flip book viewer
Search
Overview
Download as PDF
Print
Shopping cart
Full screen
Exit full screen