4TH STREET COMMUNITY DEVELOPMENT BLOCK GRANT
STREET REBUILD PROJECT
The project was paid for by the General Fund and CDBG Funds, and is completed.
Total Cost = $853,446.
BEFORE
AFTER
EDMOND STREET DRAINAGE AND REBUILD PROJECT
The project was funded by the Utility and Transportation User Fee and the Municipal Drainage
Utility System fund. Design cost = $139,270; Total cost = $1,124,389.
BEFORE
AFTER
SOUTHWOOD HILLS TOWER REHABILITATION PROJECT
The project included both sandblasting of paint and recoating inside and outside the tank, new
logo design and exterior logo lighting. Paid with funds earned via agreements with telecommunication companies who use the tower as a fixed base for antennas. Total cost = $285,286.
BEFORE
AFTER