2024 Marketing Reference Guide - Catalog - Page 24
CONTENDER
WITH FLOW COAT TECHNOLOGY
CORROSION-RESISTANT
PLASTIC-LINED CONNECTION
OVERSIZED ANODE ROD WITH
NEVERSEIZE COMPOUND
2-INCH THICK
FOAM INSULATION
FACTORY SUPPLIED
T & P VALVE
SPECIALLY FORMULATED
FLOW COAT TECHNOLOGY
ENAMEL HEAT EXCHANGER
SURFACE MOUNTED
AQAUSTAT for QUICK RESPONSE
PLASTIC JACKET
FACTORY SUPPLIED
FULL PORT DRAIN VALVE
S P E C I F I C AT I O N S A N D P E R F O R M A N C E R AT I N G S
140 F
115 F
Floor to Floor to Floor to
Drain
Boiler
Boiler
Valve
Supply Return
Shipping
Domestic
Connections Weight
Contender
Model
90 F ΔT
65 F ΔT
Height /
Gallon
Test
Working
Diameter Capacity Pressure Pressure
SSC-35
112 GPH
152 GPH
36.25”/23”
35
300 PSI
150 PSI
8”
18”
8 1/2”
3/4” NPT Male
141 LBS
SSC-50
190 GPH
258 GPH
46.5"/23"
50
300 PSI
150 PSI
7 1/2”
25 1/2”
8 1/4”
3/4” NPT Male
172 LBS
SSC-80
198 GPH
270 GPH
71.25"/23"
80
300 PSI
150 PSI
7 3/4”
25 3/4”
8 1/2”
1 1/2” NPT Male
232 LBS
SSC-119
268 GPH
364 GPH
67"/28"
119
300 PSI
150 PSI
10 1/2”
21 3/4”
10 3/4”
1 1/2” NPT Male
300 LBS
NOTE: Above chart is based on boiler size conforming to the minimum BTU/H required to achieve first hour ratings. The mass of the boiler will affect recovery time.
More boiler mass equals longer recovery time. TANK RECOVERY FROM COLD START WILL BE BETWEEN 12–15 MINUTES WHEN SIZED WITH CORRECT
FLOW RATE, BOILER SIZE AND PRESSURE DROP RATINGS FROM INSTALLATION INSTRUCTIONS.
L P - 6 6 R E V: 1 0 / 1 / 1 2