NEW Water Annual Report 2017 - Page 17



Photo above:
The new solids building, left, stands next
to the old solids building, scheduled to be
razed in 2019.
Photo left:
Caption
R2E2: A new era in
resouce recovery
Watch a time lapse of the lids and logo being placed on the digesters.
NEW WATER | 2017 ANNUAL REPORT
17

Paperturn



Powered by


Full screen Click to read
Paperturn flip book system
Search
Overview
Download as PDF
Print
Shopping cart
Full screen
Exit full screen