This ambitious 40-week project saw the shell of the original
structure converted into a heritage centre and 2 stylish newbuild apartments.
The aim was to provide a combination of new build and
heritage, with two refurbished apartments in the 18thcentury tower, alongside two new steel-framed buildings
containing a further 69 apartments and three four-bed
townhouses.
Connolly Scaffolding provided a mix of equipment for this
prestigious project.
Tube and fitting scaffolding was used alongside our
innovative Plettac Metrix system for the ultimate flexibility,
a short erection time and excellent value for money.
The scheme had previously stalled due to the principal
contractor entering into administration, but everything
restarted as the owner-developer finished the project.