EZ Purge Aquasol Corporation Brochure HR EZP.B4.0816.R3 (1) - Flipbook - Page 3
INSTALLATION GUIDE
Even for the world’s largest water soluble purge
dam 84", installation is just minutes!
Repositioning
Carefully remove tape portion
of dam from sidewall of pipe.
Adjusting to Create Proper Fit
Move to desired location and
apply additional Aquasol®
Water Soluble Tape for
reinforcement, if required.
Cut the tape portion of dam
as it is being inserted.
Overlap the cut ends to
create desired size. Repeat
if necessary.
Activate the Water Soluble Tape
Moisten an ordinary sponge
in water. Squeeze out
excess water.
Lightly dab sponge along the
water soluble tape portion of
the dam.
The dampened sponge will
reactivate the adhesive to
ensure zero air permeability.
aquasolwelding.com